GM cancels Volt, Cruze engine factory

Published Jan. 28, 2009 at 3:35 p.m.
General Motors announced last month that it was delaying construction of the Flint, Michigan factory scheduled to produce engines for the upcoming Chevrolet Cruze and Volt, but worsening economic conditions have forced the automaker to cancel the project altogether.According to ABC12, GM has cancelled all construction contracts for the Flint plan...GM failed to [...]


Back | Read more at Left Lane News

Tagthis You must log in to tag articles
Separate tags with commas
Rate this now!
  • Average rating: 3.0
  • 1
  • 2
  • 3
  • 4
  • 5
Number of ratings: 9 - Average rating: 3.0


Featured Advertiser: